system: Sub Surface Lines
client: Infraco SSL
provision: Wheel Maintenance Facilities for three Depots
completed: 2002
The contract was for the supply of consultancy services to assist in the design and supply of Wheel Maintenance Facilities in two of SSL's London Depots, at Neasden and Upminster.
Facilities include:
client: Infraco SSL
provision: Wheel Maintenance Facilities for three Depots
completed: 2002
The contract was for the supply of consultancy services to assist in the design and supply of Wheel Maintenance Facilities in two of SSL's London Depots, at Neasden and Upminster.
Facilities include:
- Wheel monitoring systems
- Underfloor wheel lathes
- Ride height adjustment equipment