system: Sub Surface Lines
client: Infraco SSL
provision: Depot Stabling Study
completed: 2006

The contract was initially to review the various Infraco SSL Depots to assess the full stabling capacity of each depot. An initial report was presented in 2002.

Following on from that report, a review was conducted of the Neasden and Wembley Park Depots looking at:
  • The entrance and exit of trains into the network
  • The cleaning and maintenance of trains within the depot
  • The movement of trains within the depot