system: Arlanda Airport Link (Stockholm)
client: Arlanda Airport/A-Train AB
provision: Maintenance Depot
completed: May 1999
This contract for the Arlanda Express airport rail link necessitated bespoke design of some items of maintenance equipment specific to the type of vehicle (X3 electric multiple units) and the conditions in Stockholm. These have been highlighted below (*).
Equipment supplied:
client: Arlanda Airport/A-Train AB
provision: Maintenance Depot
completed: May 1999
This contract for the Arlanda Express airport rail link necessitated bespoke design of some items of maintenance equipment specific to the type of vehicle (X3 electric multiple units) and the conditions in Stockholm. These have been highlighted below (*).
Equipment supplied:
- Train de-icing plant *
- Car washing plant
- Toilet discharge system
- Overhead crane
- Lifting jacks (set of four)
- Shunter (forklift driven)
- Equipment interlock system *
- Scissor lift table *
- Compressed air system
- Maintenance management system
- Roof access platforms
- All other minor maintenance and welding equipment and hand tools